In an open-pit mine, every blast moves thousands of tonnes of rock. Yet the dig plan used after the blast is usually the same plan that was drawn before it. The ore boundaries on the map stay where they were, but the ore itself does not.
The problem: rock moves by metres
Measurements in real mines show that rock moves on average about 3 m horizontally in a blast [2]. The upper layer of a bench can move 6.5 to 9.2 m [3], and some blasts have shown movements of 10 to 15 m [1].

The result is costly. Ore is sent to the waste dump and waste is sent to the plant. In one documented case at an open-pit gold mine, a single blast sent about 7,000 t of ore to the waste dump, and processing cost per gram of gold rose by 37 %; the company estimated its losses at about USD 10 million per year [2].
The solution: measure the movement
Blast movement monitoring measures how far the rock actually moved, so the dig lines can be shifted to match. At the Husab uranium mine, blast movement monitoring reduced ore loss by 1.5 % and dilution by 1.2 % [3]. Nebkatum offers this solution with a locally designed system: BMM.

Inside the beacon ball
The heart of Nebkatum BMM is a 100 mm beacon ball [7]. Inside a tough, liquid-filled shell sits a sealed floating capsule that always stays upright, like a ship. The capsule holds a copper coil, an electronics board and two batteries. The ball sleeps until the blast, feels the shock, wakes up, and is designed to transmit for more than 70 hours [4].


Finding it through rock
Radio waves do not pass through rock, but a low-frequency magnetic field does. Nebkatum's hand-held receiver is designed to pick up this weak field from 15 m deep, 30 m at most [5]. A low-noise amplifier board and a processing board sample the signal 500,000 times per second and listen to six channels at once [5].


After the blast, the receiver is carried over the muck pile. Where the signal peaks, the ball is right underneath, and the signal strength gives its depth. The point is stored with its number, sent to a phone, and the dig line is corrected.


Designed by Nebkatum, ready to build
All three boards were designed by the Nebkatum team: two-layer boards built from parts available in the Iranian market [6]. The design is complete, and building the first prototype is the next step.

BMM, from Nebkatum: know where the rock went.
All BMM performance figures are design values; nothing has been field-tested yet. Images are renders, not photographs.
References
- Potakey, N. E. and Ortiz, J. M. (2022). Review of blast movement measurements for grade control. Predictive Geometallurgy and Geostatistics Lab, Queen's University, Annual Report 2022, paper 2022-06, pp. 85-95. (Cites La Rosa and Thornton, 2011.)
- Taylor, D. L. and Firth, I. R. (2003). Utilization of blast movement measurements in grade control. APCOM 2003, South African Institute of Mining and Metallurgy, pp. 243-248. Case study: open-pit gold mine, Nevada, about 300 holes, gold at USD 300/oz (2001).
- Xie, F., Huang, L., Zhang, S.-p., Liu, Y.-l., Zhang, H.-f. and Yang, W. (2024). Study on ore loss and dilution control based on blast movement monitoring system. BLASTING 41(3), pp. 104-110. doi:10.3963/j.issn.1001-487X.2024.03.013. Husab uranium mine, Namibia.
- BMM-GDE-001 Project Guide REV1.01 and BMM-TX-002-EE (internal design documents). Design values, not yet measured.
- BMM-RX-001-EE Receiver Electrical Design REV3.00 and BMM-RX-001-FW (internal). Design values, not yet measured.
- BMM-BUY-001 Purchase plan REV4.01, 2026-11-24 (internal): every part is sourced from Iranian online shops; all three boards are 2-layer.
- BMM-TX-002-ME Transmitter Mechanical Design REV3.01 (internal): ball Ø100 mm, floating capsule Ø80 mm.