Solar Plant ERP Panel

Solar Plant ERP Panel

Your whole solar plant on one screen, live.

A web panel that gathers data from every inverter, meter and weather sensor of a solar plant and turns it into live status, alarms, maintenance work and daily reports.

Screens
Overview, inverters, alarms, maintenance, reports
Access
Any browser: control room, laptop, phone
Languages
Persian and English
Export
CSV for Excel
Specifications

Specifications

What it watches
PlantPower, energy today, irradiance, performance ratio (PR), availability, income, CO₂ avoided
Each inverterStatus, AC and DC power, DC voltage and current, AC voltage, frequency, temperature, efficiency, power limit, energy, string currents
Weather stationAir and module temperature, wind, humidity, sunrise and sunset
What it does
Plant controlGrid export limit, stop, start, reset, per-inverter power limit, maintenance mode; every action logged
AlarmsTime, device, severity, cause and state; acknowledge; one click to a work order
MaintenanceWork orders with priority, due date and parts; preventive plan; spare parts stock and purchase requests
ReportsEnergy per inverter, last 7 days and PR, energy lost by cause and its value, day summary, CSV export

How it works

The panel reads every inverter, the energy meter and the weather station continuously and keeps the history. It compares what the plant makes with what it should make under today's sun, so a weak string or a hot inverter shows up long before it costs a day of production. When something goes wrong it raises an alarm with the cause, and one click turns that alarm into a work order with the parts it needs. It opens in any browser, on a control-room screen, a laptop or a phone, in Persian or English, with nothing to install.

Open the live demo of a 1 MW plant with ten 100 kW inverters and press "Make fault": an alarm appears, the inverter's output drops, and you can follow it through a work order until the inverter runs again. The demo runs on simulated data and can be sped up to watch a whole day in minutes.

Erp en overview

Overview

How is the plant doing right now?

Plant power, energy today, irradiance, performance ratio, availability, today's income and the CO₂ avoided. A chart shows power against sunlight through the day, with the grid export limit drawn on it. Beside it are the weather station readings, every inverter's status at a glance and the alarms still open. The grid operator's export limit is set from here, and every inverter is capped to that share of its rating.

Erp en inverters

Inverters

Every inverter, side by side

One table for all inverters, with status, AC and DC power, voltages, current, frequency, temperature, efficiency, power limit and energy today, plus a chart that compares them through the day. Each inverter has eight clear states, from running and derating to fault, no communication and maintenance. Click one to see its live values, the current of each string, its power curve, device details and its own alarms, and to stop, start, reset or limit it.

Erp en alarms

Alarms

Every event, with its cause

Every event is listed with its time, device, severity, cause and state, and can be filtered to active or cleared. Typical alarms: a string with no current, over-temperature with reduced power, a grid over-voltage trip, lost communication, low insulation on the DC side and a failed cooling fan. Short events clear themselves when the inverter recovers; faults that need a technician stay open until the job is done.

Erp en maint

Maintenance

From alarm to finished job

Alarms that need a technician become work orders with a priority, a due date and the spare parts the job takes. Work moves from to do, to in progress, to done; finishing it takes the parts out of stock and brings the inverter back to normal. A preventive plan keeps routine jobs on time, such as module cleaning, thermal camera inspection, DC connector torque checks, filter cleaning and the transformer oil test, and the spare parts list sends a purchase request when stock runs low.

Erp en reports

Reports

Where every kilowatt-hour went

Energy of each inverter today, the last seven days of energy and performance ratio, and the energy lost today split by cause: grid export limit, faults, stops and maintenance, and heat derating, with what that lost energy is worth. A day summary gives energy, peak power, equivalent full-load hours, insolation, PR, availability, CO₂ avoided, income, alarms and work orders closed. Every report downloads as a CSV file for Excel.

Built for your plant

We connect the panel to the inverters, meters and sensors you already have, and shape its screens, reports, units and languages around your team. It fits a single rooftop system as well as a multi-megawatt plant, and the same approach runs factory dashboards for machines and production lines.